Since 12 September 2025, the EU Data Act has required cloud service providers, SaaS included, to make it easy for their customers to move to another provider or back to their own infrastructure. The contract must set out in writing a maximum notice period of two months, a transition of up to thirty calendar days and the list of data the customer can take away. And on 12 January 2027 comes the most visible change: from that day, the provider can no longer charge anything for switching. We explain what the contract must say, which charges can be made until then and what to review whether you sell or buy SaaS.

If you need a lawyer to review your SaaS contract, request a free initial assessment.

Table of contents

Which services are covered

Chapter VI of Regulation (EU) 2023/2854, the Data Act, requires providers of data processing services to make it easy for their customers to switch to another provider or move back to their own infrastructure. It has applied since 12 September 2025 (Article 50) and covers the cloud in the broad sense: infrastructure, platform and software as a service, SaaS included.

There are two exceptions (Article 31):

  • Custom-built services. Where the main features of the service have been developed for a specific customer and it is not offered at broad commercial scale through the provider’s catalogue, the ban on obstacles to functional equivalence, the switching charges rules and the technical obligations in Article 30(1) and (3) do not apply. The rest does.
  • Trial versions. Services provided as a non-production version, for testing and evaluation and for a limited time, fall outside the whole chapter.

In both cases, the provider must tell the customer before the contract is signed which obligations will not apply.

What the contract must say

Article 25 requires the customer’s rights and the provider’s obligations on switching to be set out in writing and provided to the customer before signing. The contract must include at least:

Clause (Article 25(2))Minimum content
NoticeA maximum of two months to initiate the switch
Transitional periodSwitching without undue delay and within thirty calendar days at most, with reasonable assistance, service continuity, information on risks and data security
Exit strategyThe provider supplies all relevant information
End of the contractWhen it is deemed terminated: on completion of the switch or, if the customer only wants its data erased, at the end of the notice period
Exportable dataAn exhaustive specification of the categories of data and digital assets that can be exported
ExclusionsData specific to the provider’s internal functioning excluded to protect trade secrets, without hindering or delaying the switch
RetrievalAt least thirty calendar days after the transitional period
ErasureFull erasure of the customer’s data and digital assets at the end of the retrieval period, once the switch has been completed successfully
ChargesThe switching charges allowed by Article 29

If the thirty-day period is technically unfeasible, the provider must say so within fourteen working days of the request, justify it and set an alternative period of no more than seven months (Article 25(4)). The customer may extend the transitional period once, for a period it considers appropriate (Article 25(5)).

Switching charges: free from 12 January 2027

This is the change with the nearest date. Article 29 sets two stages:

  • Until 12 January 2027: the provider may charge reduced switching charges, which may not exceed the direct costs the switching process itself causes it.
  • From 12 January 2027: it may not charge any switching charges at all.

Before signing, the provider must give clear information on its standard service fees, on any early termination penalties it may impose and on the reduced switching charges that apply (Article 29(4)). If a service is highly complex or costly to switch, or cannot be switched without significant interference with the data or the architecture, it must say so too (Article 29(5)), and that information must be publicly available, for example on its website (Article 29(6)).

If your contract includes exit or migration fees, it is worth reviewing it before that date.

Technical and transparency obligations

  • No obstacles. The provider may not impose commercial, technical, contractual or organisational obstacles that prevent the customer from terminating the contract, signing up with another provider, taking its exportable data or achieving functional equivalence in the new environment (Article 23).
  • Formats and interfaces. For infrastructure as a service, the source provider must facilitate functional equivalence. For everything else, SaaS included, it must make open interfaces available to the customer free of charge and, where no common specifications have been published, export the data in a structured, commonly used and machine-readable format (Article 30).
  • Information. The provider explains the switching procedures, formats and technical limitations (Article 26) and publishes on its website the jurisdiction of its infrastructure and the measures it takes against access by foreign authorities to non-personal data (Article 28).
  • Parallel use. Where the customer uses several providers at the same time, the source provider may only pass on the data egress costs it incurs, without exceeding them (Article 34).

All parties, including the destination provider, must cooperate in good faith so that the switch works and the service is not interrupted (Article 27).

Access by authorities outside the EU

Article 32 requires the provider to take measures to prevent international access to, or transfer of, non-personal data that would conflict with EU or national law. A judgment or decision of a court or authority in a third country is only recognised if it is based on an international agreement in force; otherwise it can only be complied with if the conditions of the article itself are met, the minimum amount of data is provided and the customer is informed beforehand, unless the request serves law enforcement purposes and only for as long as necessary. It is the same rule that Spain’s data centre Royal Decree 1032/2026 refers to for HIGH category public systems.

If you sell SaaS or if you buy it

If you are a provider, review your general terms: the exit schedule with the Article 25 deadlines, the list of exportable data, your switching charges policy from 12 January 2027 and the pre-contractual information that must be published. A contract that does not reflect them is still subject to the Regulation.

If you are a customer, the Data Act gives you a negotiating position you did not have before: maximum deadlines, the right to take your data in a usable format and, from January, exit at no cost. It is worth checking that the contract reflects this before you need it.

Bear in mind that the Commission’s Digital Omnibus proposal, still under negotiation, would amend the Data Act. Until it is adopted, the text in force that we have explained applies.

Does the Data Act apply to SaaS contracts?

Yes. SaaS is a data processing service for the purposes of Chapter VI of the Data Act, which has applied since 12 September 2025. Only custom-built services that are not offered at broad commercial scale are partly excluded, and non-production trial versions provided for a limited time are fully excluded (Article 31).

A maximum notice period of two months, a transitional period of up to thirty calendar days to complete the switch and a data retrieval period of at least thirty calendar days afterwards (Article 25(2)). If switching within thirty days is technically unfeasible, the provider may set an alternative period of up to seven months, and the customer may extend the transition once.

Until 12 January 2027, only reduced switching charges, which may not exceed the direct costs of the switching process itself. From 12 January 2027, none at all (Article 29). Before signing, the provider must give information on its standard fees and the applicable reduction.

The Data Act does not expressly ban them, but it requires the provider to state clearly, before signing, any early termination penalties it may impose (Article 29(4)), and it prevents contractual obstacles that discourage the customer from terminating the contract or switching provider (Article 23). Whether a specific penalty works as an obstacle should be reviewed case by case.

The provider must tell the customer within fourteen working days of the request, justify the technical unfeasibility and indicate an alternative transitional period, which may not exceed seven months. During that time it must maintain service continuity (Article 25(4)).

With the Data Act, leaving a cloud contract no longer depends on what you negotiated when you signed up. At Innovatech we draft and review SaaS and cloud contracts for providers and customers, with exit schedules, exportable data and charges in line with the Regulation, as part of our SaaS contract legal services. Tell us about your case and we will give you a free initial assessment.

Managing Partner at Innovatech Legal | Website | + posts

Marta Suárez-Mansilla is Managing Partner of Innovatech Legal and a Spanish lawyer (abogada), Madrid Bar (ICAM), working in technology law. She completed Harvard Law School's Copyright course and BerkeleyX's Blockchain programme, and has advised technology companies for more than eight years.